Ready-Mix Concrete Cost Calculator

The price a ready-mix supplier quotes you per cubic metre is almost never what you end up paying per cubic metre. Concrete is one of the few materials where the delivery mechanism costs a substantial fraction of the material itself, and where the charges that surround it barely move regardless of ho...

THE ORDER

DELIVERED COST

$1,004

6.30 in 1 load · $159 per all in

CONCRETE

$914

FEES

$90

VS HEADLINE

1.10×

Volume before waste

6.000 m³

With 5% waste

6.300 m³

Truck loads

1

Concrete

$914

Delivery

$90

Short-load surcharge

None

Waiting time

None

Pump hire

None

Effective per unit

$159 / m³

Fees as share of total

9.0%

371 bags by hand$2,226
Ready-mix delivered$1,004

Ready-mix is cheaper by $1,223, and that is before counting a day of mixing 371 bags by hand.

THE BILL

WHERE THE MONEY GOES$1,004Concrete$91491.0%Delivery$909.0%

The quoted price is not the price. Concrete itself is 91% of this bill; the rest is delivery. Those charges are largely fixed, so the smaller the pour the more they dominate — which is why the effective rate here is $159 against a headline of $145.

1 LOAD AT 8.0 PER TRUCK6.30Over the minimum load, so no short-load surcharge
BAGS OR A TRUCK — COST AGAINST VOLUME0.99break-evenyours$3,555010.1 bagsready-mix

The two lines cross at about 0.99 m³. Below that the fixed charges outweigh the cheaper concrete and bags win; above it, ready-mix pulls away quickly.

Live calculation · updates as you type

Created with❤️byeaglecalculator.com

HOW TO USE

  1. 1

    Enter the volume you need, or switch to slab dimensions and let the calculator work it out from length, width and thickness. Add a wastage allowance — five percent is normal for a straightforward pour on a level base.

  2. 2

    Put in the price your supplier quoted, per cubic metre or cubic yard, and the delivery fee they charge per load. If you are hiring a pump, add that too.

  3. 3

    Open supplier charges to set the truck capacity, the minimum load below which a short-load surcharge applies, the surcharge itself, and the waiting time terms. Take all of these from your quote rather than trusting the defaults.

  4. 4

    Read the breakdown. The effective rate per unit and the multiple against the headline price are the two figures worth looking at, because they tell you whether ordering slightly more would cost meaningfully more.

THE FORMULAS

Billable volumevolume × (1 + waste)
Truck loadsceil(volume / capacity)
Concrete costvolume × unit price
Deliveryfee × loads
Short-load chargeflat + (minimum − volume) × rate
Waiting time(expected − free) × loads / 60 × rate
Effective ratetotal / volume
Bags break-evenfixed costs / (bag rate − mix rate)

WHAT SUPPLIERS TYPICALLY CHARGE

ChargeTypical basisWhen it applies
ConcretePer m³ or yd³, by strength gradeAlways — higher grades cost more
DeliveryFlat fee per loadAlways, and it multiplies with extra loads
Short loadFlat fee, or per unit below the minimumOrders under about 3–4 m³ or 4–5 yd³
Waiting timePer hour after free unloading timeBeyond roughly 30 minutes per load
Pump hireDay rate plus sometimes per m³When the truck cannot reach the pour
Out of hoursPercentage upliftWeekends, evenings, public holidays
AdditivesPer m³Accelerators, retarders, fibres, air entrainment

Prices vary enormously by region, grade and supplier, so this calculator deliberately ships no price data — put your own quote in. The defaults are placeholders to show the shape of a bill, not a guide to what concrete should cost where you are.