Cement Render Calculator

Cement render, or plaster as it is called in much of the world, is one of the few building materials where using the right quantity matters less than using the right proportions in the right order. The quantity part is straightforward arithmetic once you know the trap: mortar does not bulk the way c...

THE WALL

OPENINGS TO DEDUCT

BASE COAT

CEMENT TO BUY

4 bags

3.54 exact · 50 kg each · 176.9 kg of cement

SAND

0.556 m³

AREA

25.23 m²

WATER

~88 L

Gross wall area

30.00 m²

Openings deducted

4.77 m²

Net render area

25.23 m²

Wet mortar volume

0.454 m³

Dry volume + waste

0.679 m³

Base coat cement

130.4 kg

Finish coat cement

46.6 kg

Sand weight

890 kg

Coverage per bag

7.13 m²

Total thickness

18 mm

APPLYING IT

1

Order 4 bags of cement and 0.556 m³ of clean sharp plastering sand.

2

Dampen the background first. A dry wall pulls water out of the mix before the cement can hydrate, and the render debonds later.

3

Lay the base coat at 12 mm in 1:4, scratch it to a key while green, and let it cure before the finish coat.

4

Finish at 6 mm in 1:6 — weaker than the coat beneath, always. A strong coat over a weak one cracks the wall rather than itself.

THE WALL

WALL ELEVATION — DRAWN TO SCALEdoorwindowwindow10.00 m × 3.00 m25.23 to render30.00 of wall less 4.77 of openingsopenings are shown at true size but placed for illustration only

Mortar is not concrete. A wet volume of 0.454 becomes 0.679 of dry material at a factor of 1.30 plus 15% waste. Concrete uses 1.54 because coarse aggregate leaves large voids for the fines to fill; render has no coarse aggregate, so it bulks far less. Applying the concrete figure here would over-order by roughly a fifth.

SECTION THROUGH THE COATS — MAGNIFIEDwall12 mmbase 1:46 mmfinish 1:618 mm total

The finish coat is weaker than the base, which is correct. Each coat should be no stronger than the one it sits on.

WHAT TO ORDER4bags of 50 kg cement3.54 exactSAND0.556 m³

Live calculation · updates as you type

Created with❤️byeaglecalculator.com

HOW TO USE

  1. 1

    Enter the wall length and height, then the doors and windows to deduct. Openings are entered as a count with a width and a height, so two identical windows need one row rather than two.

  2. 2

    Set the base coat thickness and mix. The presets cover the usual cases — 6 mm for a ceiling skim, 12 mm for internal plaster, 15 to 20 mm for external render — and the ratio buttons give the common mixes with what each is normally used for.

  3. 3

    Leave the second coat ticked for a two-coat render and set its thickness and mix. Make it weaker than the base: a 1:4 base with a 1:6 finish is a typical pairing, and the calculator warns you if you get it the wrong way round.

  4. 4

    Read off the cement bags and sand volume. Open site adjustments to change the dry volume factor, the wastage allowance or the bag size your supplier stocks.

THE FORMULAS

Net areawall area − openings
Wet volumenet area × thickness
Dry volumewet × 1.30 × (1 + waste)
Cement volumedry × c / (c + s)
Sand volumedry × s / (c + s)
Cement weightvolume × 1440 kg/m³
Sand weightvolume × 1600 kg/m³
Coverage per bagnet area / bags

MIX AND THICKNESS GUIDE

WhereMixThicknessCement per 100 m²Sand per 100 m²
Ceiling / skim1:46 mm4.5 bags0.62
Internal walls1:612 mm6.4 bags1.34
Internal, damp room1:512 mm7.5 bags1.30
External render1:415 mm11.2 bags1.56
External, exposed1:420 mm15.0 bags2.08
Plinth / waterproof1:320 mm18.7 bags1.95

Figures are per 100 m² of net wall at a 1.30 dry factor with no wastage added, using 50 kg bags. Add your own wastage on top — 15% is a sensible default for render, which is considerably more than a slab would need.

FREQUENTLY ASKED QUESTIONS

RELATED CALCULATORS

MORE CONCRETE CALCULATORS

Was this calculator helpful?

Last updated: July 29, 2026 · Formula verified · Eagle-eyed accuracy for every calculation.