Sixty-four square metres puts this into agricultural and light industrial territory: a machinery shed, a large workshop, a stable block, a barn floor. At these sizes the concrete cost stops being the dominant number and the preparation starts to be — sixty-four square metres of excavation, sub-base and compaction is a ...

SLAB DIMENSIONS

m
m
mm
$

Enter your local ready-mix price for an estimate.

RESULTS

VOLUME (exact)

6.40

WITH 10% WASTE — order this amount

7.04

25 KG BAGS

640

≈ 0.01 m³ per 25 kg bag

ESTIMATED MATERIAL COST

$1,057

at $150/m³ + 10% waste

SLAB VISUALISER (not to scale)

8 m8 m100mm

SLAB SUMMARY

Surface area64.00 m²
Thickness100 mm
Volume exact6.4000 m³
Volume +10%7.0400 m³
25 kg bags640 bags

THICKNESS GUIDE

75mm

Paths, light paving

Foot traffic

100mm

Patios, residential slabs

Standard residential

150mm

Driveways, garage floors

Vehicles

200mm

Commercial floors

Heavy loads

UNIT CONVERSIONS

1 cubic yard = 27 cubic feet

1 cubic yard ≈ 0.765 m³

80 lb bag ≈ 0.6 cubic feet

60 lb bag ≈ 0.45 cubic feet

25 kg bag ≈ 0.01 m³

Always order 10% extra for waste

Created with❤️byeaglecalculator.com

HOW TO USE

  1. 1

    The calculator opens with 8 by 8 metres already entered. Adjust the thickness to match what the slab will carry — 100 mm for a pedestrian floor, 150 mm where a vehicle will use it.

  2. 2

    Read the volume with and without the ten percent waste allowance. Order the figure with waste included; the exact figure is there so you can see how much of the order is margin.

  3. 3

    Compare the bag count against the ready-mix load count. At 6.40 cubic metres this is past the point where bags make sense on cost or effort.

  4. 4

    Switch to imperial with the unit toggle if you are working in feet and inches, or change the dimensions if your slab is not exactly 8m × 8m.

WORKED EXAMPLE

A 8m × 8m slab at 100 mm thick. The area is 8 × 8 = 64 m². Multiplying by the 0.1 m thickness gives 6.40 m³ of concrete. Adding ten percent for waste — for an uneven sub-base, spillage, and the last of the load left in the chute — brings the order quantity to 7.04 m³. That is about 16.9 tonnes. In 25 kg bags, at roughly 0.01 m³ of finished concrete per bag, that is 640 bags. From a truck holding 8 m³ it is 1 load. At 150 mm instead, the same area needs 9.60 m³, or 10.56 m³ with waste — half again the concrete for half again the depth.