Concrete for a 6m × 6m Slab

Thirty-six square metres is the size of a double garage, a serious workshop, or the footprint of a small outbuilding. It is also the point at which a slab stops being something you can reasonably pour alone. Thirty-six square metres at a hundred and fifty millimetres is over five cubic metres of concrete, and concrete ...

SLAB DIMENSIONS

m
m
mm
$

Enter your local ready-mix price for an estimate.

RESULTS

VOLUME (exact)

3.60

WITH 10% WASTE — order this amount

3.96

25 KG BAGS

360

≈ 0.01 m³ per 25 kg bag

ESTIMATED MATERIAL COST

$595

at $150/m³ + 10% waste

SLAB VISUALISER (not to scale)

6 m6 m100mm

SLAB SUMMARY

Surface area36.00 m²
Thickness100 mm
Volume exact3.6000 m³
Volume +10%3.9600 m³
25 kg bags360 bags

THICKNESS GUIDE

75mm

Paths, light paving

Foot traffic

100mm

Patios, residential slabs

Standard residential

150mm

Driveways, garage floors

Vehicles

200mm

Commercial floors

Heavy loads

UNIT CONVERSIONS

1 cubic yard = 27 cubic feet

1 cubic yard ≈ 0.765 m³

80 lb bag ≈ 0.6 cubic feet

60 lb bag ≈ 0.45 cubic feet

25 kg bag ≈ 0.01 m³

Always order 10% extra for waste

Created with❤️byeaglecalculator.com

HOW TO USE

  1. 1

    The calculator opens with 6 by 6 metres already entered. Adjust the thickness to match what the slab will carry — 100 mm for a pedestrian floor, 150 mm where a vehicle will use it.

  2. 2

    Read the volume with and without the ten percent waste allowance. Order the figure with waste included; the exact figure is there so you can see how much of the order is margin.

  3. 3

    Compare the bag count against the ready-mix load count. At 3.60 cubic metres this is past the point where bags make sense on cost or effort.

  4. 4

    Switch to imperial with the unit toggle if you are working in feet and inches, or change the dimensions if your slab is not exactly 6m × 6m.

WORKED EXAMPLE

A 6m × 6m slab at 100 mm thick. The area is 6 × 6 = 36 m². Multiplying by the 0.1 m thickness gives 3.60 m³ of concrete. Adding ten percent for waste — for an uneven sub-base, spillage, and the last of the load left in the chute — brings the order quantity to 3.96 m³. That is about 9.5 tonnes. In 25 kg bags, at roughly 0.01 m³ of finished concrete per bag, that is 360 bags. From a truck holding 8 m³ it is 1 load. At 150 mm instead, the same area needs 5.40 m³, or 5.94 m³ with waste — half again the concrete for half again the depth.