Concrete for a 12m × 12m Slab

A hundred and forty-four square metres is a commercial-scale pour. At this size almost nothing about the job is DIY: the excavation is a machine job, the sub-base needs proper compaction in layers, the concrete needs a pump or good access for several trucks, and the finishing needs a power float rather than a hand trow...

SLAB DIMENSIONS

m
m
mm
$

Enter your local ready-mix price for an estimate.

RESULTS

VOLUME (exact)

14.40

WITH 10% WASTE — order this amount

15.84

25 KG BAGS

1440

≈ 0.01 m³ per 25 kg bag

ESTIMATED MATERIAL COST

$2,377

at $150/m³ + 10% waste

SLAB VISUALISER (not to scale)

12 m12 m100mm

SLAB SUMMARY

Surface area144.00 m²
Thickness100 mm
Volume exact14.4000 m³
Volume +10%15.8400 m³
25 kg bags1440 bags

THICKNESS GUIDE

75mm

Paths, light paving

Foot traffic

100mm

Patios, residential slabs

Standard residential

150mm

Driveways, garage floors

Vehicles

200mm

Commercial floors

Heavy loads

UNIT CONVERSIONS

1 cubic yard = 27 cubic feet

1 cubic yard ≈ 0.765 m³

80 lb bag ≈ 0.6 cubic feet

60 lb bag ≈ 0.45 cubic feet

25 kg bag ≈ 0.01 m³

Always order 10% extra for waste

Created with❤️byeaglecalculator.com

HOW TO USE

  1. 1

    The calculator opens with 12 by 12 metres already entered. Adjust the thickness to match what the slab will carry — 100 mm for a pedestrian floor, 150 mm where a vehicle will use it.

  2. 2

    Read the volume with and without the ten percent waste allowance. Order the figure with waste included; the exact figure is there so you can see how much of the order is margin.

  3. 3

    Compare the bag count against the ready-mix load count. At 14.40 cubic metres this is past the point where bags make sense on cost or effort.

  4. 4

    Switch to imperial with the unit toggle if you are working in feet and inches, or change the dimensions if your slab is not exactly 12m × 12m.

WORKED EXAMPLE

A 12m × 12m slab at 100 mm thick. The area is 12 × 12 = 144 m². Multiplying by the 0.1 m thickness gives 14.40 m³ of concrete. Adding ten percent for waste — for an uneven sub-base, spillage, and the last of the load left in the chute — brings the order quantity to 15.84 m³. That is about 38.0 tonnes. In 25 kg bags, at roughly 0.01 m³ of finished concrete per bag, that is 1,440 bags. From a truck holding 8 m³ it is 2 loads. At 150 mm instead, the same area needs 21.60 m³, or 23.76 m³ with waste — half again the concrete for half again the depth.