A hundred and forty-four square metres is a commercial-scale pour. At this size almost nothing about the job is DIY: the excavation is a machine job, the sub-base needs proper compaction in layers, the concrete needs a pump or good access for several trucks, and the finishing needs a power float rather than a hand trow...
Enter your local ready-mix price for an estimate.
RESULTS
VOLUME (exact)
14.40 m³
WITH 10% WASTE — order this amount
15.84 m³
25 KG BAGS
1440
≈ 0.01 m³ per 25 kg bag
ESTIMATED MATERIAL COST
$2,377
at $150/m³ + 10% waste
SLAB VISUALISER (not to scale)
SLAB SUMMARY
THICKNESS GUIDE
Paths, light paving
Foot traffic
Patios, residential slabs
Standard residential
Driveways, garage floors
Vehicles
Commercial floors
Heavy loads
UNIT CONVERSIONS
1 cubic yard = 27 cubic feet
1 cubic yard ≈ 0.765 m³
80 lb bag ≈ 0.6 cubic feet
60 lb bag ≈ 0.45 cubic feet
25 kg bag ≈ 0.01 m³
Always order 10% extra for waste
The calculator opens with 12 by 12 metres already entered. Adjust the thickness to match what the slab will carry — 100 mm for a pedestrian floor, 150 mm where a vehicle will use it.
Read the volume with and without the ten percent waste allowance. Order the figure with waste included; the exact figure is there so you can see how much of the order is margin.
Compare the bag count against the ready-mix load count. At 14.40 cubic metres this is past the point where bags make sense on cost or effort.
Switch to imperial with the unit toggle if you are working in feet and inches, or change the dimensions if your slab is not exactly 12m × 12m.
A 12m × 12m slab at 100 mm thick. The area is 12 × 12 = 144 m². Multiplying by the 0.1 m thickness gives 14.40 m³ of concrete. Adding ten percent for waste — for an uneven sub-base, spillage, and the last of the load left in the chute — brings the order quantity to 15.84 m³. That is about 38.0 tonnes. In 25 kg bags, at roughly 0.01 m³ of finished concrete per bag, that is 1,440 bags. From a truck holding 8 m³ it is 2 loads. At 150 mm instead, the same area needs 21.60 m³, or 23.76 m³ with waste — half again the concrete for half again the depth.
Concrete Slab Volume Calculator
Calculate instantly →
Concrete Footing Volume Calculator
Calculate instantly →
Concrete Bags Calculator
Calculate instantly →
Concrete Patio Calculator
Calculate instantly →
Concrete Driveway Calculator
Calculate instantly →
Concrete Mix Ratio Calculator
Calculate instantly →
Post Hole Concrete Calculator
Calculate instantly →
Concrete Steps Calculator
Calculate instantly →
Rebar Quantity Calculator
Calculate instantly →
Cement Render Calculator
Calculate instantly →
Ready-Mix Concrete Cost Calculator
Calculate instantly →
Concrete Wall Volume Calculator
Calculate instantly →
Concrete Path Calculator
Calculate instantly →
Pool Deck Concrete Calculator
Calculate instantly →
Concrete for 3m × 3m Slab Calculator
Calculate instantly →
Concrete for 4m × 4m Slab Calculator
Calculate instantly →
Concrete for 5m × 5m Slab Calculator
Calculate instantly →
Concrete for 6m × 6m Slab Calculator
Calculate instantly →
Concrete for 8m × 8m Slab Calculator
Calculate instantly →
Concrete for 10m × 10m Slab Calculator
Calculate instantly →
Last updated: July 29, 2026 · Formula verified by EagleCalculator team · Eagle-eyed accuracy for every calculation.